Lot Improvements    
 
     
 
     Click to see the House Demolition Video
     Click to see the Tree Removal Video


• Tree Clearing and Stump Removal
• General Grading
• Foundation Excavation and Foundation Backfill Utilizing Existing Material on the Site
• Driveway
• Home to Curb line Connection of City Water and City Sewer
• Fill or the Removal of Fill would be an additional cost
• Septic System would be required for Lots that do not have City Sewer available at the Lot. Design based on Lot Soil Conditions and design of Home
• Overhead Electrical Connection from Curb to Home
• Telephone and CATV Exterior Cables shall be located on the same side of the home as the Electrical Service.

     

Hi-Bor   Tyvek   Simpson   Milgard   Owens Corning    Pergo     Abby Carpet     Jacuzzi     Kohler    Corian

  << Back